Final Foundation work moves along slowly

As May turned to June we waited and waited until finally our foundation work could be completed. Schafbuch Concrete returned and finished our window wells and poured our porch piers. Meticulous Masonry did a meticulous job filling in the large area in the front that was used to drive on to the foundation. They also filled in the four rear knockout that allowed the beams that carried the house to lower below the foundation line when the house was set on the foundation. On June 21 and 22 Iowa City got 5 inches of rain. With the open basement windows and open cellar door entry we had water that deep. Quick-acting staff pumped it out and saved the furnace that was sitting there waiting for installation.

 